India’s Best EOT Crane Manufacturer

Crane Installation – A Project Engineer’s Responsibility

Crane installation day is an important day for the project engineers. They have to take several things into consideration during that day. They have to make sure that everything is on its track on the installation day. So, if you are a project engineer, your search stops here. We will discuss everything that you have to face during that day.

 

Fundamental things that you have to know

Before you start the installation process, you have to understand a few things. To be precise, you have to perceive your company’s requirements. You have to make sure that you are choosing the correct crane. For that, there are some questions to which you need to seek an answer.

  • What will be the direction of the crane?
  • How often will you use the crane?
  • How high do you need to install your cane?
  • How will you support the crane?
  • Fathom the distance between the lowest point of the ceiling and the floor.

Once you get the answers to these questions, you can pick up the best crane of all. It will also ensure a smooth installation.

Suitable crane for the workplace

Next, you have to choose a suitable crane for your workplace. Being an engineer, you have to study the support structure of the building and how much it is capable of handling. Make sure not to choose a crane specifically for a single project. Try to purchase one that can be compatible with future projects and the company’s growing demand.

Installation time

It mainly depends on the type of crane that you are trying to install. Besides, the facility has a pivotal role to play in this factor. Depending on these factors, it may take 3-5 hours or even several days.

Preparation of your employees

Now, it is a massive part of the process. You have to create a game plan. It will help your employees to understand what they need to do during the installation day. Maybe, you have to do it when your employees are on the clock, which can be pretty challenging. Safety is an essential part. Ensure all your employees have thorough training regarding operation and installation. They also have to gather knowledge about maintenance.

Your employees should be able to fathom the signs if the crane requires repair. Plus, they should be well aware of the steps to avoid the breakdown of cranes. It will help you to protect your employees and equipment.

The initial inspection is imperative.

Once you install the crane, you have to conduct a professional and certified inspection immediately. Next, your company has to follow the inspection schedule. That schedule comes with various points such as:

  • Functional test
  • Periodic inspection
  • Frequent inspection

The best option for you is to hire a crane inspector. He or she will make sure that you are maintaining the standards. It will ensure that you are getting a return for your investment.

Safety rules for the workers and engineers

You have to ensure the safety of your workers. Also, you have to take care of your safety. Here we will share some tips with you on safety. It will help you as well as your workers.

  1. Don’t forget regular inspection: Your hoist should work fine, and that is the first thing you have to check. If you are using the crane, it is a mandatory point. Similarly, even if you are not using the crane, we would suggest frequent inspection. It will help you in maintaining the crane.
  2. The employees and the overhead crane operator should always stay aware: Whenever you are planning to use an overhead crane, make sure to inform everyone about that. Keep in mind that everyone has to take the same mental load. Making your employees aware of that will help you to distribute the load amongst yourself.
  3. There should be no obstacles to the crane: It is one of the most critical safety measures. You may find it the most obvious thing, but there will be mental pressure, and that can make you forget this important thing. So, take some extra care about it.
  4. Comprehend the overhead limits: All the handling systems come with a weight limit, and safety is the reason. Hence, don’t think of pushing the limits and exceeding the load limit. It may cause an unwanted accident.
  5. Test your crane: Before using it for your operations, we will suggest you test your crane meticulously. It will give you a brief idea about its performance. You can also understand how it will work during the required situations.

Some quick tips

  • Avoid distractions.
  • Avoid swinging the load.
  • Make sure not to move the load over the workers.
  • Stay away from loading the co-workers during the operations.

So, keep these points in your mind if you are thinking of installing a crane. It will be your responsibility as you are the project engineer. Apart from your safety, you have to think about your employee’s safety. Thus, follow the points that we mentioned and install your overhead crane successfully.