The lift that ends the outage
The turbine-generator is assembled and overhauled here. Lowering the rotor and stator demands heavy capacity and the finest possible micro-speed — this lift sets the plant’s return-to-service date.
- What hangs from the hookTurbine rotor, generator stator, casings, condenser parts.
- When the crane failsEvery hour the rotor lift is delayed is lost generation revenue.
- The LOADMATE answerDouble-girder EOT cranes with main + auxiliary hoist and VFD micro-speed for precise rotor laydown.





