Home / Industries / Renewable & Wind

Industries · Renewable & Wind

Lifting the heaviest components in clean energy.

Wind towers, nacelles, blades and gearboxes are among the largest single components made in any factory. LOADMATE supplies heavy double-girder EOT and goliath cranes with precise micro-speed for wind-component manufacturing and handling.

LOADMATE cranes and hoists for Renewable & Wind
Renewable & Wind — cranes & hoists engineered for your plant
Up to ~100 tComponent duty
Long spanTower & blade bays
Main + auxHoist options
Pan-IndiaService & spares
We know your plant

Renewable & Wind, area by area.

Wind-energy manufacturing is heavy-lift work at large scale. Tower sections, nacelles, hubs, gearboxes and generators are huge, high-value and unforgiving — every move needs real capacity and fine control, often over long factory bays.

LOADMATE engineers cranes for exactly that: long-span double-girder EOT cranes with main and auxiliary hoists and VFD micro-speed for nacelle and component assembly, and goliath cranes for tower sections and outdoor loadout of oversized parts.

Where we lift

Walk the plant — click any area.

Each area has its own loads, its own hazards, and its own way of testing a crane. Tap a stage to jump to it.

LOADMATE Tower fabrication Cans, sections & flanges

Long, heavy plate work

Tower sections are rolled, welded and fitted from heavy steel plate in long bays. The cans and sections are long, heavy and awkward — handling them sets the pace of tower production.

  • What hangs from the hookRolled cans, tower sections, flanges, heavy plate.
  • When the crane failsA crane down in the tower bay stalls a whole production line.
  • The LOADMATE answerLong-span double-girder EOT cranes with main + auxiliary hoists for turning and fitting tower sections.
LOADMATE Nacelle assembly Mainframe, gearbox & generator

Precision over high value

The nacelle is assembled from mainframe, gearbox, generator and drivetrain — heavy, high-value components positioned with care. Precision and reliability protect parts worth crores.

  • What hangs from the hookMainframes, gearboxes, generators, drivetrains.
  • When the crane failsA mishandled nacelle component is a high-value loss and a schedule hit.
  • The LOADMATE answerDouble-girder EOT cranes with VFD micro-speed for precise nacelle component placement.
LOADMATE Blade & component handling Blades, hubs & moulds

Awkward, oversized loads

Blades and hubs are oversized and delicate; moulds and machined components are heavy and precise. Handling here is about controlled lifts of awkward, valuable parts.

  • What hangs from the hookBlades, hubs, moulds, machined castings.
  • When the crane failsA dropped blade or hub is scrap — and weeks of delay.
  • The LOADMATE answerEOT cranes and wire rope hoists with soft VFD control and lifting beams for long, awkward loads.
LOADMATE Loadout & dispatch Towers, nacelles & blades

Outdoor heavy lifting

Finished tower sections, nacelles and blades are the heaviest, longest loads to leave the plant — moved outdoors onto trailers for transport to site.

  • What hangs from the hookTower sections, nacelles, blades, hubs.
  • When the crane failsA loadout delay holds specialised transport and the project schedule.
  • The LOADMATE answerGoliath / gantry cranes, weatherised and sized for oversized outdoor loadout.
Recommended equipment

The right lift for Renewable & Wind.

LOADMATE Double Girder EOT Cranes

Double Girder EOT Cranes

Long-span, heavy, precise cranes for tower and nacelle bays with main + auxiliary hoists.

Explore
LOADMATE Goliath Cranes

Goliath Cranes

Outdoor handling and loadout of tower sections, nacelles and blades.

Explore
LOADMATE Electric Wire Rope Hoists

Electric Wire Rope Hoists

Component and maintenance lifting across the plant.

Explore
Applications

Where it runs.

Wind tower manufacturing — rolling, welding, fit-up.
Nacelle & drivetrain assembly — gearbox, generator.
Blade & hub production — moulding and finishing.
Solar & renewables fabrication — structures and modules.
Why LOADMATE

Built to last where it matters.

Engineered, not catalogued

Every crane is designed to your bay, loads, duty class and environment — not pulled off a shelf.

Built & tested in-house

Design, fabrication, hoist, wiring, paint and a 125% load test, all under one roof at Surat.

IS-code & ZED certified

IS 3177 / 807 / 4137 / 3938 / 6547, ISO 9001:2015 and Government of India ZED Gold.

Pan-India service

Erection, commissioning, spares and a responsive service team across India and 30+ export markets.

FAQs

Renewable & Wind — common questions.

What capacity do you supply for wind components?

Heavy double-girder EOT cranes sized to your heaviest nacelle, gearbox or tower section — commonly up to ~100 t, with auxiliary hoists for lighter, faster handling.

Can you provide long-span cranes for tower and blade bays?

Yes — long-span double-girder cranes engineered for the extended bays used in tower and blade production.

Do you offer micro-speed for precise assembly?

Yes — VFD stepless control gives fine, repeatable micro-speed for positioning high-value nacelle and drivetrain components.

Can you handle outdoor loadout of oversized parts?

Yes — goliath / gantry cranes, weatherised and sized for moving tower sections, nacelles and blades onto transport.

Which standards do you build to?

IS 3177 and IS 807 for cranes, IS 3938 for wire rope hoists, with ISO 9001:2015 and ZED Gold certification, and a 125% load test.

Planning a lift for your renewable & wind plant?

Send your loads, span, duty cycle and environment. Our application engineers respond within 24 hours with a configuration, spec sheet and quote.